Bartonsville, Vermont -- December 23, 2011
Bartonsville residents are still trying to decide what to do with wreckage from a covered bridge damaged by Irene.
Six proposals are before the select board for cleanup, ranging from $42,000 to $180,000 in costs.
A committee is also moving forward on the design of a new replacement bridge.
The destruction of the bridge was captured on video by a neighbor and quickly became one of the most famous images of the storm in Vermont.